Scope
17500m2 including kitchens, recreation buildings.
Design, fabrication, transport and installation of Village.
Inclusive of architectural, electrical reticulation, Plumbing, Concrete slabs design, as well as Building Construction.
Building features:
Remote Site in the Democratic Republic of the Congo
Logistics and handling of cross border transport.
Tailor made base system to suite contours on site; to minimise ground clearing consequential erosion.
Modular building system, utilising Structural Insulating Panels. (SIPS)
Some bases installed in excess of 2m off ground.
Click on the Images for full size view























